During the peak phase of construction (up to two years) there are scheduled to be an additional 1,300 HGVs EACH WAY passing through Wardington.
Mitch Hickman, our Parish Clerk, has produced a short video illustrating the difficulty the existing HGV traffic has in passing through the village. Please share this with as many people as you can to raise awareness.
Well done Mitch. Wardington does not need or want the extra traffic. A permanent by-pass is essential now and for the future. An absolute necessity if HS2 goes ahead.