News from the Memorial Hall
IMPROVEMENTS TO THE HALL As recently reported in The Warbler the planned improvements to the Hall took place in December. Firstly the reverberation panels have been fixed to almost the entire area of the main Hall ceiling. This has resulted in a significant reduction in the ‘echo’ in the Hall leading to much improved acoustics and speech intelligibility generally, especially on occasions such as cinema nights and bingo. The terraced area at the far end of the Hall has now been paved with quality natural stone slabs. This has included the pathway on the south side of the Hall along with new surface drainage for the whole rear area. Additional fencing and a gateway above the retaining wall adjacent to the